日韩欧美亚洲一区-日韩欧美亚洲视频-日韩欧美亚洲国产-日韩欧美天堂-日韩欧美手机在线-日韩欧美视频在线一区二区

Location:HomeNewsCompany News

NEWS

(86)020-81326513

Stay Gold, Keep Mission in Mind and Forge ahead – Synchronization with Power Grid Has Been Accomplished for Guantao County Domestic Waste to Energy Project Contracted by GDE Edit Date:2021/02/09



       Guantao County Domestic Waste to Energy Project is located in Handan City, Hebei Province. The total daily capacity of waste is 800 tons. The project is divided into two phases:1st phase has capacity 500 t/d, equipped with 1× 500 t/d mechanical grate incinerator, 1×9MW steam turbine generator, with reserved land for the 2nd phase with 300t/d capacity.

       Since construction of the project started in September 2019, Project Department of our company has worked hard with unity, overcoming difficulties, and done solid jobs in all aspects of work with scientific control, comprehensive management, positive anti-epidemic and overcoming several effects such as rain season, cold winter, delay delivery of equipment etc. With concern and support of government departments at all levels and coordination of all project parties, a series of important milestones have been carried out such as foundation construction of main workshop , erection of the first batch of boiler steel, topping out of main building structure, boiler water pressure test, steam turbine generator running etc.

       According to the schedule required by ministries and agencies at all levels of Guantao County, Handan city, Hebei province at 05:28 am on 1st January, 2021, Synchronization with power grid has been accomplished at the 1st try. This is the 1st project with successful synchronization among 42 waste to energy projects under construction in the province in 2019.

       During the trial run, although the Chinese new year was coming soon, project staff actively mobilized resources from all sides and accelerated the overall progress of the project with good epidemic prevention measures.

       By 8th February, there were still 15 engineering and management personnel on duty on site in two daily shifts regularly inspecting boiler, steam engine and auxiliary equipment and other operating conditions, recording operating parameters of each equipment in detail to ensure normal operation of each equipment, and timely eliminate defects.

       When encountering difficulties, GDE project department accomplished missions. It is said that Keep fighting in gold armor until Lou Lan has been broken. All the staff of project department with firm faith, unity and dedication to their duties, strived to fight the tough battle at the end of the year.

Picture:

 Li Yu, thermal engineer was checking water pump

 Zhou Jianhe, electrical engineer, was instructing operation

 Lei Huanxin and Wei Chuanbin, thermal engineers were checking drawings on site

 Huang Guangbing, electrical engineer was monitoring power generation system

 Mr. Liang, Manager of Project Department was cooking for night shift staff at night before Luna Year Eve.

主站蜘蛛池模板: 就要精品综合久久久久五月天 | 国产一级一级 | 亚洲国产精品免费在线观看 | 手机国产日韩高清免费看片 | 免费特黄 | 国产精品高清在线观看 | 福利盒子手机看片 | 亚洲最大色网站 | 国产亚洲一级精品久久 | 国产亚洲精品高清在线 | 国产一区二区三区在线观看精品 | 在线观看精品视频一区二区三区 | 午夜在线观看视频在线播放版 | 日韩欧美不卡一区二区三区 | 日本aaaa级毛片在线看 | 精品精品国产高清a毛片 | 欧美日韩1区2区 | 男女一级黄色片 | 亚洲另类欧美日韩 | 在线免费观看中文字幕 | 看日本黄大片在线观看 | 日韩黄色在线视频 | 日本一级作爱片在线观看 | 九九99香蕉在线视频美国毛片 | 一级一级特黄女人精品毛片视频 | 欧美精品在线视频 | 欧美国产在线观看 | 亚洲dvd| 欧美高清在线视频 | 国产成人福利夜色影视 | 午夜在线视频 | 欧美日韩国产在线观看一区二区三区 | 五月天综合色 | 国产aaa免费视频国产 | 国产一区二区视频在线播放 | 午夜网站入口 | 日本三片在在线播放 | 欧美日韩亚洲在线 | 国产免费做爰午夜视频 | 亚洲欧洲中文字幕 | 国产成人精品综合网站 |