Location:HomeCaseBeer

PROJECTS

(86)020-81326513

Beer

??????Authorized by the relevant departments, GDE has elaborated Design Standard of Brewery, Design Standard of Malthouses and other design manuals. Through all these years, we have built long-term partnership with a great number of well-known beer companies at home and abroad. Our clients include Tsingtao Brewery, AB Inbev, China Resources Snow Breweries, Zhujiang Brewery, Kingway Brewery, Carlsberg, Yanjing Beer, Asia Pacific Brewries and Kirin Beer, etc.

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Location:Time:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

China Resources Snow Brewey( Sichuan) CO.ltd

Location:ChengduTime:2007

The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

 

Guangzhou Nansha Pearl River Beer Co., Ltd Annual 300,000 kL Beer Production Line Relocation Project

Location:Time:

The relocation project locates in Nansha Development Zone, Guangzhou. Annual capacity is expected to be 1.3 million kL beer. The design and construction of main workshop have been accomplished at a time and equipment will be moved phase by phase, where the 1st phase relocation leads to annual capacity 300,000 kL beer.
New technologies, such as no-soil filtration, automatic warehouse, flexible packaging line, low energy consumption saccharification are adopted.
Design began on Aug, 2011; construction started on Jan, 2013; Phase 1 works was completed on Sep, 2015; and relocation was completed in 2016.
Project Awards:
Guangdong Province 2019 Zhan Tianyou Hometown Cup Prize;
First Prize of 2019 Excellent Engineering in Light Industry

China Resources Snow Brewey( Sichuan) CO.ltd

Location:ChengduTime:2007

The feasibility report, scheme design and work drawing for relocation and new build 600000 KL beer/year project.

 

Guangzhou Asia Pacific Brewery Co., Ltd.

Location:Huangpu District, GuanzghouTime:-

Area covered: about 125,868 square meters (188.8 mu);
Floorage: 57,089 square meters;
Green area: 37,144 square meters;
Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

Tsingtao Brewery (Fuzhou) Plant

Location:FuzhouTime:2004

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Guangzhou Asia Pacific Brewery Co., Ltd.

Location:Huangpu District, GuanzghouTime:-

Area covered: about 125,868 square meters (188.8 mu);
Floorage: 57,089 square meters;
Green area: 37,144 square meters;
Description: The buildings of this project include: brew comprehensive building, facilities, packing house, office building, building for life service, wastewater treatment station, bicycle shed and so on.

Tsingtao Brewery (Fuzhou) Plant

Location:FuzhouTime:2004

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Anheuser-Bush (Foshan) Brewing CO.ltd

Location:FoshanTime:2008-2009

The primary design and work drawing for the second continuation.

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Location:Liu an(Anhui)Time:2007-2008

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

Anheuser-Bush (Foshan) Brewing CO.ltd

Location:FoshanTime:2008-2009

The primary design and work drawing for the second continuation.

China Resources Snow Brewery(LiuAn) Co.,Ltd.

Location:Liu an(Anhui)Time:2007-2008

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project.

Beijing Yanjing Beer Group Corporation

Location:BeijingTime:-

The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

Kingway Brewery(ChenDu) Co.,Ltd.

Location:ChengduTime:2006

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

Beijing Yanjing Beer Group Corporation

Location:BeijingTime:-

The primary design, scheme design and work drawing for the Hi-tech Bacteria-free treatment and filling equipment technique improvement project: Pure draft beer 60000kl/year, beer 200000t/year, malt 200000t/year.

Kingway Brewery(ChenDu) Co.,Ltd.

Location:ChengduTime:2006

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 100000KL beer annual.

HeBei ZhuJiang Brewery Co.,Ltd.

Location:Lu quan(Hebei Province)Time:2007

The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

Location:Zhan jiangTime:2005

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

HeBei ZhuJiang Brewery Co.,Ltd.

Location:Lu quan(Hebei Province)Time:2007

The feasibility report, scheme design and work drawing for the new build 100000 KL beer/year project.

ZhanJiang ZhuJiang Brewery Co.,Ltd.

Location:Zhan jiangTime:2005

The feasibility report, scheme design and work drawing for the relocation and new build 220000 KL beer/year project; 2008: 50000bottle/hr filling production line design.

ZhongShan ZhuJiang Brewery Co.,Ltd.

Location:ZhongshanTime:2005

The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

DongGuan ZhuJiang Brewery Co.,Ltd.

Location:Dong GuangTime:2004

The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

ZhongShan ZhuJiang Brewery Co.,Ltd.

Location:ZhongshanTime:2005

The feasibility report, scheme design and work drawing for the first item of 100000 KL beer/year project (storage, filtration, package and related civil facilities).

DongGuan ZhuJiang Brewery Co.,Ltd.

Location:Dong GuangTime:2004

The feasibility report, scheme design and work drawing for the new build 200000 KL beer/year project.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Location:Chengdu Time:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Tsingtao Brewery(YuLin)Co.,Ltd.

Location:Yulin(shanxi) Time:2005

The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

Tsingtao Brewery(ChengDu)Co.,Ltd.

Location:Chengdu Time:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first phase of 100000KL beer/year project.

Tsingtao Brewery(YuLin)Co.,Ltd.

Location:Yulin(shanxi) Time:2005

The primary design and work drawing for the expanding plan of 100000 KL beer/year project.

Tsingtao Brewery(Jinan)Co.,Ltd.

Location:JinanTime:2006

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Location:XuzhouTime:2005

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(Jinan)Co.,Ltd.

Location:JinanTime:2006

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Tsingtao Brewery(XuZhou)Co.,Ltd.

Location:XuzhouTime:2005

The feasibility report, primary design and work drawing for the relocation of 200000 KL beer/year project.

Kingway Brewery(FoShan) Co.,Ltd.

Location:FoShanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Kingway Brewery(DongGuan) Co.,Ltd.

Location:DongguanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

Kingway Brewery(FoShan) Co.,Ltd.

Location:FoShanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Kingway Brewery(DongGuan) Co.,Ltd.

Location:DongguanTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project; 200000KL beer annual project.

Kingway Brewery(XiAn) Co.,Ltd.

Location:XiAnTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Benthanh Brewery Factory,Vietnam

Location:VietnamTime:2007

Kingway Brewery(XiAn) Co.,Ltd.

Location:XiAnTime:2007

The primary design and work drawing for the complete plan of 400000 KL beer/year project; the first item of 200000KL beer annual project.

Benthanh Brewery Factory,Vietnam

Location:VietnamTime:2007

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Location:Wushu(Xinjiang)Time:2007

The work drawing for the re-constructed 120000KL beer/year project.

Brafaso Brewery Ouagadougou,Burkina Faso

Location:BrafasoTime:2007

100000 kl/year plan( the first phase is 50000kl/year)

Xinjiang Wusu Beer(WuSu)Co.,Ltd.

Location:Wushu(Xinjiang)Time:2007

The work drawing for the re-constructed 120000KL beer/year project.

Brafaso Brewery Ouagadougou,Burkina Faso

Location:BrafasoTime:2007

100000 kl/year plan( the first phase is 50000kl/year)

Luoyang Asia Brewery Co.,Ltd.

Location:LuoyangTime:2006-2007

The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

Kun Ming Hua Shi Brewery Co.,Ltd.

Location:Kun MingTime:2006

The work drawing for the relocated 120000KL beer annual project.

Luoyang Asia Brewery Co.,Ltd.

Location:LuoyangTime:2006-2007

The feasibility report, scheme design and work drawing for the relocated 200000KL beer/year l project.

Kun Ming Hua Shi Brewery Co.,Ltd.

Location:Kun MingTime:2006

The work drawing for the relocated 120000KL beer annual project.

Sderin Brewery(FuJian) Co.,Ltd.

Location:Futian(Fujian) Time:2005

The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.

Sderin Brewery(FuJian) Co.,Ltd.

Location:Futian(Fujian) Time:2005

The feasibility report, scheme design and work drawing for the expanding plan of 50000 KL beer/year project.

主站蜘蛛池模板: 天天干天天操天天干 | 图片专区亚洲欧美另类 | 最近中文日本字幕免费完整 | 国产成人福利视频网站 | 亚洲欧美日韩一区二区在线观看 | 成人性色大片 | 欧美一道本 | a级做爰视频免费观看 | 国产精品二区三区 | 三级四级特黄在线观看 | 又粗又黄又硬又爽的免费视频欧美 | 日本高清乱码中文字幕 | 日韩网| 91福利在线观看视频 | 国产美女在线观看 | 日本欧美一区二区免费视 | 国产乱插| 福利一区二区在线观看 | 综合另类| 国产午夜毛片一区二区三区 | 日韩欧美毛片免费看播放 | 三级网址在线播放 | 性刺激的欧美三级视频 | 国产精品一区久久 | 亚洲不卡在线视频 | 中文在线免费看视频 | 青青视频国产 | 亚洲国产精品一区二区首页 | 日本一区二区三区免费高清在线 | 99久久99| 中国日韩欧美中文日韩欧美色 | 国产精品久久福利网站 | 在线观看91精品国产性色 | 看片一区 | 国内一级一级毛片a免费 | 高清精品一区二区三区一区 | 精品视频手机在线观看免费 | 日本aaa成人毛片 | 日韩成人综合网 | 精品国产三级a在线观看 | 欧美成人性高清观看 |